SAP Packaging Materials ABAP SELECT Generator (Material Type VERP)
Packaging materials in SAP are plain material master records with a packaging material type. This generator writes the Open SQL join across MARA, MAKT and MARC so you can list them by plant.
Fill in
Packaging materials in a plant
REPORT zpack_materials.
SELECT m~matnr,
t~maktx,
m~mtart,
m~matkl,
m~meins,
m~brgew,
m~gewei,
c~werks,
c~dispo,
c~beskz
FROM mara AS m
INNER JOIN makt AS t
ON t~matnr = m~matnr
AND t~spras = 'E'
INNER JOIN marc AS c
ON c~matnr = m~matnr
WHERE m~mtart = 'VERP'
AND c~werks = '1000'
AND m~lvorm = @abap_false
ORDER BY m~matnr
INTO TABLE @DATA(lt_pack)
UP TO 500 ROWS.Optional material group filter
" Add to the WHERE clause when a group is needed: " AND m~matkl = '[Material group (blank for all)]' LOOP AT lt_pack ASSIGNING FIELD-SYMBOL(<ls_pack>). WRITE: / <ls_pack>-matnr, <ls_pack>-maktx, <ls_pack>-werks. ENDLOOP.
Material type VERP is the standard SAP type for packaging materials, but many companies create their own types, so confirm in table T134. Fields: MARA-MTART material type, MARA-MATKL material group, MARC-WERKS plant, MARC-DISPO MRP controller, MARC-BESKZ procurement type. Check that your release supports this Open SQL syntax. In some releases the order of clauses differs, so adjust if the syntax check fails.
Ask SAP for packaging data in plain English
Optional review of read-only natural language access to your SAP data.
Optional. The tool and every export work without this. No spam.
How to use it
Enter your material type (VERP is the SAP default for packaging), plant and language, then copy the SELECT into a report in SE38 or ADT. Remove the group filter if you want all groups. The result lists material number, description, base unit, gross weight, MRP controller and procurement type for each plant record.
- Confirm material type in T134
- Use SE16N to preview the data first
- Limit rows when testing
- Add authority checks before production use
Tables involved
MARA holds general material data such as type, group, base unit and weight. MAKT holds descriptions per language, joined with SPRAS. MARC holds plant specific data such as MRP controller and procurement type. The deletion flag MARA-LVORM filters materials marked for deletion. Packaging materials and returnable packaging also relate to packaging instructions in packing-instruction tables, which this query does not cover.
Reading the result
Packaging materials often have a procurement type of external procurement (F). The MRP controller shows who plans them. If a material appears without a description, there is no MAKT entry in your chosen language. Use the output to build a packaging BOM list, check missing weights or find items without an MRP controller before a planning run.
Common mistakes
Assuming every packaging item uses VERP, because many plants use custom types. Forgetting the language filter on MAKT and getting duplicate rows. Running an unrestricted SELECT on a large system. Add authorisation checks and row limits, and test in a sandbox before moving a program to production.
Frequently Asked Questions
What is material type VERP in SAP?
VERP is the standard SAP material type for packaging materials. It controls which views and fields are available in the material master. Many companies define their own types, so check T134 for your configuration.
Which tables hold material master data?
MARA holds general data, MAKT holds descriptions per language, and MARC holds plant data. Other tables such as MARD for storage location stock and MBEW for valuation hold additional views.
Can I run this in SE16N?
SE16N reads one table at a time, so use it to preview MARA by MTART. For the join across three tables you need a report, a CDS view or a query tool.
Will this work in older ECC systems?
The inline DATA declaration and @ escape syntax need ABAP 7.40 or higher. In older releases declare the result table explicitly and drop the @ characters.
Netray can help turn questions like this into read-only ERP queries with the SQL shown, so planners get answers without writing ABAP.
Related Tools
SSCC-18 Pallet Shipping Label ZPL Generator
Fill in ship-to, PO, GTIN, quantity and SSCC to get ZPL for a 4 x 6 inch GS1-128 pallet label.
Quality & InspectionPackaging Line Clearance and Label Reconciliation Checklist
Confirm the line is clear of old materials and that printed labels reconcile before and after a packaging run.
SAPSAP Handling Unit Label Template
Fill in handling unit data and get a label layout with SSCC and GS1 application identifiers, ready to hand to a label developer or warehouse team.
More SAP tools
See allNew to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP Open Production Orders ABAP SELECT GeneratorFill in plant, order type and dates and get a ready ABAP Open SQL query for open production orders.
- SAP Open PO Items ABAP SELECT GeneratorFill in plant, document type and dates to generate ABAP Open SQL that lists open PO items with received quantity from EKBE.
- ABAP SELECT Statement GeneratorFill in table, fields and a WHERE condition and get modern ABAP Open SQL: SELECT INTO TABLE, SELECT SINGLE and a safe FOR ALL ENTRIES pattern.
AI on your ERP
- AI for ERP in Packaging and Printing: Estimating, Waste and Job TicketsPrivate AI on your ERP for converters and printers: job estimating, substrate and ink usage, make-ready waste, die tooling, proofs and food-contact records.
- AI for ABAP Development: A Private Code LLM That Knows Your Z ObjectsUsing an LLM for ABAP on ECC and S/4HANA: what SAP's own ABAP AI covers, where a private code model helps, and how to keep transports governed.