Choosing an Epicor implementation partner for aerospace manufacturing
Aerospace manufacturers on Epicor Kinetic need a partner who understands lot and serial traceability, revision control, inspection and nonconformance processes, and the hosting choices ITAR and CMMC obligations drive. Kinetic covers much of this with its quality, engineering and job management modules; the partner's job is to configure them to support AS9100 evidence and your customers' flowdowns. Evaluate partners on aerospace process knowledge and their honesty about hosting constraints.
When this makes sense
- You are selecting Kinetic for an aerospace machine shop or assembler.
- AS9100 audits find gaps in traceability or revision control.
- You handle ITAR-controlled technical data and need to decide on cloud versus on-prem hosting.
- CMMC requirements are coming through your prime contracts.
- You are moving from an older Epicor version and want to fix quality processes.
What the engagement covers
Traceability
Lot and serial tracking from receipt to shipment, material certifications attached to lots, and as-built records.
Engineering and revision control
Engineering Workbench, approved revisions, ECO groups and revision effectivity on jobs.
Quality
Inspection plans, nonconformance and DMR processing, corrective actions and supplier quality.
First article inspection
Capturing FAI data against operations and characteristics, aligned to AS9102 forms, often with add-on tools.
Job management
Job costing, operation tracking, outside processing for special processes and certifications.
Hosting and compliance
On-prem or cloud hosting choice based on ITAR and CMMC obligations, with access controls and audit logging.
How it runs
- 1
Assessment (2-4 weeks)
- Map AS9100 processes to Kinetic
- Review customer flowdowns
- Decide hosting approach
- 2
Design (4-6 weeks)
- Design traceability and quality processes
- Plan revision control
- Define FAI approach
- 3
Configure and test (8-16 weeks)
- Configure modules
- Test with real jobs
- Validate audit evidence
- 4
Go-live and support (4-8 weeks)
- Cut over
- Support first audits
- Refine processes
What you get
- AS9100 process to Kinetic mapping
- Traceability and quality process designs
- Hosting and access control design
- Configured modules and test evidence
- Training and work instructions
What drives cost and effort
| Traceability depth | Full serial traceability adds setup and testing. |
| Quality process complexity | Many inspection plans and NCR workflows add configuration. |
| Hosting choice | On-prem or specialized hosting adds infrastructure work. |
| FAI tooling | Add-on tools add licensing and integration. |
| Data conversion | Historical lot and serial records need careful loading. |
Fixed-scope implementation
Aerospace shops with documented AS9100 processes and a hosting decision already made with their export compliance lead.
Phased time and materials
Suppliers whose quality, FAI and traceability requirements vary by customer and will be discovered during design.
Independent advisory alongside an implementer
Companies that want a second opinion on traceability design and hosting choices without replacing their partner.
Questions to ask any Epicor consultant
How have you configured traceability for AS9100 audits?
Audit evidence depends on correct setup.
What is your approach to ITAR data and hosting?
Hosting decisions affect compliance obligations.
How do you handle FAI in Kinetic?
FAI is often a gap requiring add-ons.
Can you show revision control setups you have done?
Revision errors cause nonconforming parts.
What is your relationship with Epicor and how do we verify it?
Verify claims with Epicor directly.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Traceability gaps found in audits.
Test traceability end to end before go-live.
ITAR data in the wrong hosting environment.
Decide hosting with export compliance input before implementation.
Revision errors on jobs.
Enforce approved revisions and ECO processes.
Quality processes not used.
Design simple workflows and train inspectors.
If your aerospace work is low volume without ITAR data, a general Epicor partner with good quality module experience may be enough. Specialized help matters when you handle ITAR data, face CMMC requirements or have audit findings.
Frequently asked questions
Is Epicor Kinetic suitable for aerospace?
Kinetic is widely used by job shops and make-to-order manufacturers, including aerospace suppliers, for job management, traceability and quality. Detailed first article inspection and characteristic-level data are areas where companies often add specialist tools. Test your own AS9100 scenarios in demos.
Can Kinetic be hosted in a way that supports ITAR obligations?
Hosting choices affect how you meet ITAR obligations, mainly who can access technical data and where it is stored. Discuss the options with Epicor and your export compliance lead before signing; on-prem hosting gives you the most direct control of access.
Does Kinetic support AS9100?
Kinetic provides traceability, revision control, inspection and nonconformance features that support AS9100 processes. Certification belongs to your organization and depends on how you use the system, so design configuration around the evidence auditors ask for.
What about CMMC?
CMMC applies to your systems and processes that handle FCI or CUI, not to the ERP product itself. Hosting, identity, access controls and audit logging around Kinetic should be designed to fit your system security plan.
How does Netray help aerospace manufacturers?
Netray, with partner Epicor specialists, focuses on private, on-prem AI over Kinetic data so controlled technical data stays on your infrastructure. Typical uses are traceability questions and NCR trend analysis, read-only by default.