Aerospace & DefenseFree referencePDF, Excel, Word exportAerospace MRO

ATA Chapter Numbers Reference List

ATA chapter numbers are the common filing system for aircraft maintenance manuals, illustrated parts catalogues, task cards and defect reports. This searchable list gives the chapter number, the standard title and the group it belongs to.

Download:
ATA chapterSystem titleGroup
05
Time Limits / Maintenance Checks
General
06
Dimensions and Areas
General
07
Lifting and Shoring
General
08
Leveling and Weighing
General
09
Towing and Taxiing
General
10
Parking, Mooring, Storage and Return to Service
General
11
Placards and Markings
General
12
Servicing
General
18
Vibration and Noise Analysis (Helicopter)
General
20
Standard Practices Airframe
General
21
Air Conditioning
Aircraft systems
22
Auto Flight
Aircraft systems
23
Communications
Aircraft systems
24
Electrical Power
Aircraft systems
25
Equipment / Furnishings
Aircraft systems
26
Fire Protection
Aircraft systems
27
Flight Controls
Aircraft systems
28
Fuel
Aircraft systems
29
Hydraulic Power
Aircraft systems
30
Ice and Rain Protection
Aircraft systems
31
Indicating / Recording Systems
Aircraft systems
32
Landing Gear
Aircraft systems
33
Lights
Aircraft systems
34
Navigation
Aircraft systems
35
Oxygen
Aircraft systems
36
Pneumatic
Aircraft systems
37
Vacuum
Aircraft systems
38
Water / Waste
Aircraft systems
44
Cabin Systems
Aircraft systems
45
Central Maintenance System
Aircraft systems
46
Information Systems
Aircraft systems
47
Nitrogen Generation System
Aircraft systems
49
Airborne Auxiliary Power
Aircraft systems
51
Standard Practices and Structures General
Structures
52
Doors
Structures
53
Fuselage
Structures
54
Nacelles / Pylons
Structures
55
Stabilizers
Structures
56
Windows
Structures
57
Wings
Structures
60
Standard Practices Propeller / Rotor
Propeller and rotor
61
Propellers / Propulsors
Propeller and rotor
62
Main Rotor(s)
Propeller and rotor
63
Main Rotor Drive(s)
Propeller and rotor
64
Tail Rotor
Propeller and rotor
65
Tail Rotor Drive
Propeller and rotor
66
Rotor Blade and Tail Pylon Folding
Propeller and rotor
67
Rotors Flight Control
Propeller and rotor
71
Power Plant
Power plant
72
Engine
Power plant
73
Engine Fuel and Control
Power plant
74
Ignition
Power plant
75
Air
Power plant
76
Engine Controls
Power plant
77
Engine Indicating
Power plant
78
Exhaust
Power plant
79
Oil
Power plant
80
Starting
Power plant
81
Turbines (Reciprocating Engines)
Power plant
82
Water Injection
Power plant
83
Accessory Gear Boxes (Engine Driven)
Power plant
84
Propulsion Augmentation
Power plant
85
Fuel Cell Systems
Power plant

Chapter numbers follow the ATA 100 / iSpec 2200 numbering used by most OEM manuals. Manufacturers add their own section and subject numbers below the chapter (the ATA 21-51-01 style). Always confirm titles against your OEM manual revision.

Defect trending by ATA chapter

Optional review of how your defect records could be queried by system and repeat rate.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Type a chapter number or a system word such as hydraulic or landing into the search box to filter the table. Use it when coding defects in your maintenance system, when sorting work package task cards by system, or when reading an unfamiliar OEM manual. Export to Excel to build a pick list for a defect coding screen, or to PDF to print a desk reference for the planning office.

  • Search by number or by words in the title
  • Group column separates systems, structures, propeller and rotor, and power plant
  • Export keeps all 65 rows for use as a lookup tab

How the numbering is built

A full ATA reference has three parts: chapter, section and subject, written as ATA 32-31-01. The chapter tells you the system (32 is landing gear), the section the sub-system (31 covers extension and retraction in many manuals) and the subject the individual unit or task. Only the two digit chapter is standardised across manufacturers. Section and subject numbers differ between OEMs and sometimes between models of the same OEM, so a code mapping built for one fleet should not be reused blindly for another.

Common mistakes and ERP notes

The most common error is storing the ATA code as a number. Chapter 05 becomes 5 and no longer sorts or joins to the manual. Store it as a two character text field. A second error is mixing chapter level coding for reliability reports with section level coding for task cards in the same field. Most MRO and ERP systems let you hold the chapter, section and subject in separate columns, which makes defect trending by system far easier.

  • Keep the leading zero
  • Hold chapter, section and subject separately
  • Gaps in the list (13 to 17, 39 to 43) are reserved or unused numbers, not missing data

Frequently Asked Questions

What does ATA stand for?

ATA stands for Air Transport Association of America, now Airlines for America. The ATA 100 specification created the chapter numbering, and it was later carried into the iSpec 2200 standard that most OEMs use for manuals and data exchange.

What is the difference between ATA 100 and iSpec 2200?

ATA 100 is the older specification for manual structure and numbering. iSpec 2200 replaced it and added digital data requirements, but it kept the same chapter numbers, so the list stays valid for both.

Which ATA chapters are engine related?

Chapters 71 to 85 cover the power plant. ATA 72 is the engine itself, 73 fuel and control, 79 oil and 80 starting. Chapter 49 covers the auxiliary power unit and 54 covers nacelles and pylons.

Are ATA codes the same for helicopters?

The chapter numbers are shared, with rotorcraft using 60 to 67 for rotors and drives and 18 for vibration analysis. Always check the manufacturer manual because section numbers vary.

If your defect and task data already carries ATA codes, we can build a read-only question layer over it so planners can ask for repeat defects by system in plain language.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Software