Quality & InspectionFree templatePDF, Excel, Word exportAutomotive

IATF 16949 Documentation Templates: Quality Manual, Scope Example and Management Review Agenda

This pack gives you the documents most IATF 16949 users ask for first: a quality manual outline, a scope statement, a management review agenda and a list of documented information to keep. Fill in your details, export to Word, and adapt to your processes.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

IATF 16949 Documentation Template Pack (Quality Manual, Scope, Management Review)

Quality Manual: Northfield Precision Components Ltd

Revision: Rev 01 Site: Plant 1, 24 Industrial Park Road, Pune Management representative: Quality Manager

Purpose: this manual describes how Northfield Precision Components Ltd meets the requirements of IATF 16949 together with ISO 9001 and applicable customer-specific requirements.

1. Scope of the quality management system

The quality management system of Northfield Precision Components Ltd applies to the design-independent manufacture of: CNC machining and assembly of aluminium housings and steel shafts for powertrain and chassis applications.

Support functions included in the scope: corporate purchasing, engineering support and logistics located at the head office.

Exclusions and justification: Product design responsibility (clause 8.3) is excluded because all products are built to customer designs.

The scope considers the context of the organization, the needs of interested parties and customer-specific requirements, and is available as documented information.

2. Manual structure

SectionContentWhere documented
Context and leadershipContext, interested parties, policy, roles, product safety, corporate responsibilityQM-01, policy statement
PlanningRisks and opportunities, objectives, contingency plans, change planningRisk register, objectives plan
SupportResources, competence, calibration and laboratory scope, documented informationTraining matrix, calibration list
OperationContract review, APQP, supplier control, control plans, production, release, nonconforming productAPQP plan, control plans, work instructions
Performance evaluationCustomer satisfaction, internal audits, management reviewAudit programme, review minutes
ImprovementCorrective action, problem solving, continual improvement8D reports, CAPA log

3. Management review agenda

Date: 2026-11-12 Chair: top management of Northfield Precision Components Ltd Secretary: Quality Manager

ItemTopicInput to review
1Actions from previous reviewOpen action status
2Changes in context, interested parties, risks and opportunitiesUpdated risk register
3Customer feedback and satisfactionScorecards, complaints, field returns, customer-specific requirement changes
4Quality objectives and process performanceObjectives status, process effectiveness and efficiency
5Product conformity and deliveryInternal and customer ppm, delivery performance, premium freight
6Cost of poor qualityInternal and external failure costs, scrap, rework
7Audit resultsInternal, second-party and certification audit findings
8Corrective actions and nonconformitiesOpen and overdue actions, repeat issues
9Supplier performanceSupplier ratings and development plans
10Resources, warranty and product safetyCapacity, training, warranty data, product safety events
11Opportunities for improvement and decisionsResource needs, objective changes

4. Key documented information to maintain

ClauseDocumented informationOwnerStatus
4.3Scope of the QMSQuality Manager
4.4.1.2Product safety processEngineering
5.2Quality policyTop management
6.2Quality objectivesTop management
6.1.2.3Contingency plansOperations
7.1.5.3Internal laboratory scopeQuality
8.5.1.1Control plansQuality
9.2.2Internal audit programmeQuality Manager
9.3Management review recordsQuality Manager

Approvals

Prepared by / Date
Management representative / Date
Top management / Date

A starting point, not a certification guarantee. Check each clause against your copy of IATF 16949 and your certification body's expectations. The clause numbers shown are those commonly used for these items; confirm them in your edition and add customer-specific requirements.

Search your QMS with a private AI assistant

Optional discussion of an on-prem assistant that finds IATF evidence in your documents.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Mandatory documents and procedures

IATF 16949 keeps the ISO 9001 approach of documented information rather than a fixed list of procedures, and adds automotive items such as the product safety process, contingency plans, laboratory scope, control plans and an internal audit programme. A quality manual is not formally required by ISO 9001, but the IATF rules expect the scope and the process interactions to be documented, and most certification bodies expect a manual or equivalent. Treat the table in this template as a core set, then add what your customers require.

Writing a scope statement that passes audit

Auditors check three things in a scope. It names the products and processes, it lists support functions that are included even when they sit at another location, and any exclusion is limited to product design where the organization is not design responsible. Remote support functions such as purchasing or engineering at head office must be in the scope of the site that depends on them. Customer-specific requirements need to be considered and recorded.

  • Name the site and the products or processes.
  • List remote support functions explicitly.
  • Justify any exclusion, which in IATF can only concern design responsibility.
  • Keep the scope available as documented information.

Management review and the count of shall requirements

The management review needs defined inputs beyond ISO 9001: cost of poor quality, process effectiveness and efficiency, product conformity, delivery performance, customer scorecards and field returns are all expected. For the shall count, there is no single official number: totals differ with how a count treats sub-clauses and the ISO 9001 base, and the standard includes a large number of additional automotive requirements. Count them by clause in your own gap assessment instead of quoting a figure from the internet.

Frequently Asked Questions

What are the mandatory procedures for IATF 16949?

The standard asks for documented information rather than a fixed list of named procedures. Typical items include the scope, quality policy, objectives, product safety process, contingency plans, laboratory scope, control plans, internal audit programme and management review records. Your customers may add more through customer-specific requirements.

Is a quality manual required for IATF 16949?

ISO 9001 no longer requires one, but IATF expects the scope and process interactions to be documented, and certification bodies commonly expect a manual or equivalent structure. Keeping a short manual that references your procedures is the safe option.

Can I exclude requirements from the IATF 16949 scope?

Only product design and development is allowed as an exclusion, and only when the organization is not design responsible. Support functions, on-site or remote, must be included, and the exclusion must be justified in documented form.

How many shall requirements are in IATF 16949?

There is no authoritative single number because totals depend on the counting method and on whether the ISO 9001 base clauses are included. If you need a figure for planning, count the clauses in your own copy and record it in your gap assessment.

Netray can build a private assistant over your QMS documents that answers audit questions and finds the evidence, running entirely on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs