Free tool
Module Fit and Gap Explorer
Pick your manufacturing requirements once and see which official ERP module covers each one, what needs a separate product, and where the gaps are. Module names come from vendor documentation, with sources on every page.
Choose an ERP
Infor
Infor SyteLine (CloudSuite Industrial)
24 application modules and 12 add-ons or related products mapped. Native module coverage on 58 of 69 library requirements.
Open the SyteLine explorerInfor
Infor LN (formerly Baan)
35 application modules and 9 add-ons or related products mapped. Native module coverage on 58 of 69 library requirements.
Open the Infor LN explorerInfor
Infor M3 (formerly Movex)
22 application modules and 16 add-ons or related products mapped. Native module coverage on 54 of 69 library requirements.
Open the M3 explorerOracle
Oracle JD Edwards EnterpriseOne
41 application modules and 6 add-ons or related products mapped. Native module coverage on 56 of 69 library requirements.
Open the JDE E1 explorerSAP
SAP ECC 6.0 (SAP ERP Central Component)
28 application modules and 12 add-ons or related products mapped. Native module coverage on 59 of 69 library requirements.
Open the SAP ECC explorerSAP
SAP S/4HANA (on-premise and Cloud Private Edition)
40 application modules and 10 add-ons or related products mapped. Native module coverage on 63 of 69 library requirements.
Open the S/4HANA explorerOracle
Oracle E-Business Suite (EBS) 12.2
63 application modules and 7 add-ons or related products mapped. Native module coverage on 64 of 69 library requirements.
Open the Oracle EBS explorerEpicor
Epicor Kinetic (formerly Epicor ERP 10)
26 application modules and 17 add-ons or related products mapped. Native module coverage on 51 of 69 library requirements.
Open the Kinetic explorerSYSPRO
SYSPRO ERP (SYSPRO 8)
30 application modules and 8 add-ons or related products mapped. Native module coverage on 48 of 69 library requirements.
Open the SYSPRO explorerOracle
Oracle NetSuite
34 application modules and 7 add-ons or related products mapped. Native module coverage on 53 of 69 library requirements.
Open the NetSuite explorerWhat the requirement library covers
69 requirements written the way manufacturing ERP teams phrase them in a fit-gap workshop, grouped into 10 areas:
- Order to cash (8)
- Procure to pay (7)
- Plan to produce (10)
- Quality (7)
- Service and aftermarket (5)
- Finance and costing (7)
- Inventory and warehouse (7)
- Projects, ETO and engineering (7)
- Multi-site and multi-entity (5)
- Regulatory and compliance (6)
How to read a fit
- Native module. Covered inside the ERP application. Some native modules are optional and licensed separately; the module map says which.
- Vendor add-on. A separate product from the same vendor that integrates with the ERP.
- Partner / third party. Needs a product from another company, even if the ERP ships the interface.
- Gap. Not covered by anything we could document. Plan custom work or a process change, and confirm with the vendor.
Questions
What does the Module Fit and Gap Explorer do?
It maps 69 manufacturing requirements, from order to cash through quality, service, projects and multi-site, to the official modules of an ERP. For each requirement you see whether it is covered by a native module, a separate product from the same vendor, a third-party product, or not at all.
Where do the module names and fits come from?
From the vendor's own documentation and product pages, listed as sources on every ERP page. When we could not confirm a fit or a licensing detail, it is marked verify with vendor instead of being counted as a clean fit.
How is the fit score calculated?
Each selected requirement is weighted by priority (Must 3, Should 2, Nice to have 1). A native module scores 100 percent of the weight, a vendor add-on 75, a partner product 50 and a gap 0. The score is the weighted share, from 0 to 100.
Can I compare two ERPs?
Yes. Every ERP uses the same requirement library, so your selection carries over. Open the Compare step and pick a second ERP to see both scores, area charts and a requirement-by-requirement table.
Do I need an account?
No. Everything runs in your browser and the report downloads as PDF, Excel, Word or CSV without a login. A free Netray account is optional and only saves your selection so you can reopen it on another device.