Component Repair vs Exchange Breakeven Calculator
A repair quote looks cheap until you add the time the aircraft waits and the chance that the shop finds the unit beyond economic repair. This calculator puts repair and exchange on the same footing so you can see which one costs less per unit of remaining life.
Your numbers
Quoted price for the repair, including test.
Expected life versus a new or fully overhauled unit.
If found BER you still buy the exchange unit.
Pool or loaner fee, or carrying cost of the spare you tie up.
Your results
Simplified comparison. It ignores warranty differences, core charges, tax and any cost of failed borrowed units.
Cost per full life vs repair quote
Sweeps Repair quote from 2000 to 80000, holding your other inputs fixed.
Repair economics from your ERP
Optional: we can look at how your repair order history could feed vendor BER and life statistics automatically.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the repair quote, turn time and the life you expect afterwards. Add the probability that teardown finds the unit beyond economic repair (BER), then the exchange price, its delivery time and life. The cost of a day without the part is whatever a pool loaner, lease or tied-up spare costs you. The tool outputs the saving per full life and the highest repair price you should accept.
The logic
A repair that ends in BER still costs you the replacement, so the expected spend includes the BER probability times the exchange price. Both options carry downtime cost for their turn time. Dividing each total by the fraction of full life delivered puts them on a like-for-like basis, since a repaired unit with a shorter expected life is not as valuable as a new one.
- Repair total = quote + BER x exchange price + turn days x day cost
- Exchange total = price + delivery days x day cost
- Adjusted cost = total / life fraction
- Breakeven quote solves repair adjusted = exchange adjusted
Worked example
With an 18,000 dollar quote, 45 days, 70 percent life, 15 percent BER risk and a 52,000 dollar exchange at 100 percent life, repair costs about 46,000 dollars per full life against 54,000 for exchange, so repair saves about 8,000. The breakeven quote is roughly 27,000 dollars. Raise the BER risk to 40 percent and the advantage shrinks sharply.
Common mistakes
Ignoring BER risk, using unit price while forgetting that a pooled part may be free of core charges, and assuming repair returns full life are common. Track your real BER rate and post-repair removal rates by part number and vendor so these inputs come from data and not a guess.
Frequently Asked Questions
Where do I get the BER probability?
From your own repair orders: count units returned as beyond economic repair divided by units sent to that vendor for that part number. If history is thin, ask the vendor for their rate and treat it as a lower bound.
What is a fair cost of a day without the part?
Use the pool or loaner daily fee when you rent one. If you carry spares, use the carrying cost of the spare. For AOG exposure use a separate delay cost model.
Why divide by remaining life?
Because a repair that gives 70 percent of the life is worth less than a new unit. Without the adjustment the comparison favours whatever is cheapest upfront and not what is cheapest to operate.
Does this cover the cost of a core?
No. If your exchange includes a core credit or charge, net it off the exchange price before entering it.
Netray can build an agent over your purchasing and repair order history that calculates BER rate and repair cost per part number and vendor on demand.
Related Tools
MRO Component Repair Quote Comparison Worksheet
Compare vendor repair quotes on total landed cost including freight and downtime, with cost per warranty day and approval status, then export to Excel.
Maintenance & ReliabilityComponent Removal Rate, MTBUR and NFF Cost Calculator
Compute MTBUR, MTBF, removal rate per 1,000 hours and the annual cost of no-fault-found removals from fleet hours and removal counts.
Aerospace & DefenseLLP Remaining Life and Pro-Rata Value Calculator
Calculate remaining cycles, life consumed, pro-rata value and the date to order a replacement for a life-limited part, with a chart over utilization.
Aerospace & DefenseMRO Component Repair Order Request Template
Fill in a clean repair request covering part identity, history, removal reason, requested scope and release documents, then export to PDF or Word.
More Aerospace & Defense tools
See allKeep exploring
Free tools
- MRO Component Repair Quote TemplateProduce a clear component repair quote with scope, price basis, turn time, warranty and beyond-economic-repair terms.
- Aircraft Component Repair vs Replace Cost CalculatorCompare total repair cost with the cost of a new unit after adding downtime and adjusting for remaining life, and find the break-even repair price.
- MRO Turn Time CalculatorAdd up the stages of a repair, see total turn time against target, the value-adding share and the work in process your shop will carry.
Guides
- Depot Repair Operations: Designing the Process and the Systems Behind ItDepot repair operations for manufacturers: RMA intake, evaluate and quote, turnaround control, exchange pools, and ERP setup in SyteLine and Infor LN.
- AI in MRO: Aerospace Use Cases That Work and Realistic ROIAI in MRO and AI for MRO: predictive maintenance, tech-log classification, 8130-3 drafting and repair quoting. What works today, data needed, realistic payback.
- AI-Powered Aerospace ERP SolutionsAerospace-specific ERP solutions with AI. AS9100 compliance, ITAR management, MRO optimization, and traceability for aviation and space manufacturers.