SAPFree referencePDF, Excel, Word exportSAP ECC 6.0All SAP ECC 6.0 tools

SAP QM Sample Management Tables: QPRVK, QPRVP, QPRS and Related Objects

This reference maps the SAP ECC 6.0 QM sample management objects: the sample-drawing procedure (QPRVK, QPRVP), physical sample drawings (QPRN), physical samples (QPRS) and their links to inspection lots, inspection points and sampling procedures. It also lists the transactions that maintain each object.

Download:
ObjectTypeDescriptionKey / main fieldsLinks toUse
QPRVK
Table
Sample-drawing procedure header
MANDT, PRZIEHVERF, VERSION; GUELTIGAB valid-from, QMASTAUTH auth group, KZQUIT confirmation required, GEBANZ drawing by number of containers
QPRVKT, QPRVP, QALS, QPRS
Find which procedures exist and whether confirmation of the drawing is required
QPRVKT
Table
Sample-drawing procedure texts
MANDT, PRZIEHVERF, VERSION, SPRACHE; KURZTEXT
QPRVK
Short text of a procedure in each language
QPRVP
Table
Sample-drawing procedure items
MANDT, PRZIEHVERF, VERSION, POSNRPRZV; STPRPLAN1/2 sampling scheme, AQLWERT1/2 AQL, PRANZ1/2 fixed number of samples, FAKTORPR1/2, ANZRUECKL reserve samples
QPRVK, QDPK (sampling scheme), TQ42 (container)
How many primary, pooled and reserve samples each item draws
QPRS
Table
Physical sample master record
MANDT, PHYNR; PRART sample type, PN_NR drawing number, MENGE/MEINH sample size, PLOS2 lot, MATNR, WERKS, CHARG, PNVER/PNVEV procedure and version, ABORT, ABDAT storage deadline, ENTDATUM/ENTZEIT drawing date and time
QPRN, QALS, QPRVK, TQ40, TQ41
The physical sample itself: what, how much, where it is stored and until when
QPRN
Table
Physical-sample drawing
MANDT, PN_NR; PLOS lot, MATNR, WERKS, CHARG, MBLNR/MJAHR/ZEILE, AUFNR, KZQUIT, FRGNA/FRGDT release
QALS, QPRS, AUFK, MKPF
One drawing event that produces one or more physical samples; confirmation and release data
QALS
Table
Inspection lot record
PRUEFLOS; PRBNAVERF and PRBNAVV sample-drawing procedure and version, STPRVER sampling procedure, STAT12 confirmation required, STAT13 inspection point type (3 = physical sample)
QPRVK, QPRN, QPRS, QAMV
Link from the lot to the sample-drawing procedure that the task list proposed
QAPP
Table
Inspection point
PRUEFLOS, VORGLFNR, PROBENR; PHYNR physical sample number
QALS, QPRS, QASV
In sample management, each physical sample becomes an inspection point for results recording
QAMV
Table
Characteristic specifications for inspection processing
PRUEFLOS, VORGLFNR, MERKNR; STICHPRVER sampling procedure
QALS, QDSV, QASV
Which sampling procedure each lot characteristic uses
QASV
Table
Sample specifications for inspection processing
PRUEFLOS, VORGLFNR, MERKNR, PROBENR; PRSTUFE inspection stage, PRSCHAERFE severity
QALS, QDPS, QDEP
Calculated sample size per characteristic and partial sample
PLKO
Table
Task list header
PLNTY, PLNNR, PLNAL; QPRZIEHVER and QVERSNPRZV sample-drawing procedure and version, QKZRASTER inspection points indicator
QPRVK
Where the sample-drawing procedure is assigned in the inspection plan header (QP01/QP02)
PLMK
Table
Inspection plan characteristics
PLNTY, PLNNR, PLNKN, MERKNR; STICHPRVER sampling procedure, PROBENR partial sample number
QDSV, PLKO
Characteristic-level sampling procedure and partial sample assignment
QDSV
Table
Sampling procedure
STICHPRVER; STICHPRART sampling type, BEWERTMOD valuation mode, STPRPLAN sampling scheme, AQLWERT, PROZUMF, KZRAST inspection points (incl. sample management)
QDPK, QDEP, PLMK, QAMV
Statistical sample size and valuation per characteristic (not the physical drawing)
QDPK
Table
Sampling scheme header
STPRPLAN
QDSV, QPRVP
Scheme (for example an AQL-based scheme) referenced by sampling procedures and drawing items
QPV1 / QPV2 / QPV3
Transaction
Create / change / display sample-drawing procedure
Procedure and version
QPRVK, QPRVP
Maintain procedures that drive physical-sample creation
QPR1 / QPR2 / QPR3
Transaction
Create / change / display physical sample
PHYNR
QPRS
Manual physical samples or correction of generated ones
QPR4
Transaction
Confirm physical-sample drawing
PN_NR
QPRN, QALS
Required before results recording when the procedure demands confirmation (KZQUIT)
QDV1 / QDV2 / QDV3
Transaction
Create / change / display sampling procedure
STICHPRVER
QDSV
Maintain statistical sampling procedures
QA03 / QA32
Transaction
Display inspection lot / inspection lot worklist
PRUEFLOS
QALS
See the sample tab of a lot and the drawing that belongs to it

Field names come from the ECC 6.0 data dictionary. Confirm in SE11 on your system, especially if you run industry add-ons (for example stability study fields in QPRS). Use SE16N with the key fields above to trace a lot to its samples: QALS-PRUEFLOS to QPRN-PLOS to QPRS-PN_NR to QAPP-PHYNR.

Get a lot-to-sample report spec

Tell us your inspection types and we send a reviewed field list and join path for a sample tracking report on your ECC system.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Sampling procedure vs sample-drawing procedure

SAP QM has two similarly named objects that do different jobs. The sampling procedure (QDV1, table QDSV) is statistical: it decides how many units of each characteristic are inspected and how results are valued, and it is assigned per characteristic in PLMK. The sample-drawing procedure (QPV1, tables QPRVK and QPRVP) is physical: it decides how many physical samples are drawn from the lot, in which containers, and whether drawing must be confirmed. It is assigned in the inspection plan header and copied to QALS when the lot is created.

  • Sample size per characteristic: QDSV, result in QASV.
  • Number of physical samples: QPRVP, result in QPRN and QPRS.
  • Results per physical sample: inspection points in QAPP with PHYNR.

Worked example: tracing a lot to its samples

A goods receipt creates inspection lot 010000004711. In SE16N, QALS shows PRBNAVERF = RAW01 and PRBNAVV = 000001, the sample-drawing procedure from the plan. QPRN with PLOS = 010000004711 returns drawing number 000000001203, and QPRS with PN_NR = 000000001203 returns three physical samples with their sizes in MENGE and MEINH, storage location in ABORT and deadline in ABDAT. QAPP for the lot shows one inspection point per sample, with PHYNR filled, which is where results are recorded in QE51N.

How to use the table

Search by table name, field name or transaction. The keys column lists the fields you need for joins and the most useful attributes; the links column names the parent or child tables. Export to Excel when you are writing a functional spec or an ABAP report so the developer has the joins in one place. When a field you need is not listed, open the table in SE11 rather than guessing: QPRS in particular carries many optional fields for stability studies and handling units.

Gotchas

QALS does not have a field called PRZIEHVERF; the lot stores the procedure in PRBNAVERF and the version in PRBNAVV, both checked against QPRVK. QPRS stores the procedure as PNVER and PNVEV. If KZQUIT is set in the procedure, results recording is blocked until the drawing is confirmed with QPR4, which is a frequent cause of lots that seem stuck. Physical samples are only created automatically when the inspection type and plan are set up for sample management.

Frequently Asked Questions

Which SAP table stores the sample-drawing procedure?

QPRVK holds the header of the sample-drawing procedure, keyed by PRZIEHVERF and VERSION, with texts in QPRVKT. The items, including sampling scheme, AQL and number of primary, pooled and reserve samples, are in QPRVP. Maintain them with QPV1, QPV2 and QPV3.

Where are physical samples stored in SAP QM?

Physical samples are in QPRS, keyed by PHYNR. Each sample references the drawing number PN_NR in QPRN, the inspection lot, material, plant and batch, the sample size in MENGE and MEINH, and the storage location and deadline. Display or change them with QPR3 and QPR2.

What is the difference between QDV1 and QPV1?

QDV1 creates a sampling procedure, which defines the statistical sample size and valuation per inspection characteristic. QPV1 creates a sample-drawing procedure, which defines how many physical samples are drawn from a lot and whether the drawing must be confirmed. A lot can use both at the same time.

How do I link an inspection lot to its physical samples?

Read QPRN where PLOS equals the lot number to get the drawing number PN_NR, then read QPRS where PN_NR matches to get each PHYNR. For results, read QAPP where PRUEFLOS equals the lot; the PHYNR field on each inspection point identifies the physical sample.

If you want quality engineers to ask SAP QM about lots, samples and results in plain English on your own servers, we can set that up over your ECC system.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations