SAPFree templatePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP IDoc Reprocessing Runbook Template

Reprocessing IDocs is simple when one expert does it and risky when it is passed around. This runbook template gives support staff a repeatable procedure for one interface, including limits, approvals and what not to do.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

SAP IDoc Reprocessing Runbook Template

Runbook: Customer orders (ORDERS05)

Interface ID: IF-001 Direction: Inbound Message type: ORDERS Last reviewed: 2026-10-20

Scope

This runbook covers IDocs for Customer orders (ORDERS05) in failure statuses 51, 56. Target time to recover is 4 business hours. Bulk reprocessing above 500 IDocs in one run needs approval from Order to cash lead.

Procedure

StepActionToolCheck
1List failed IDocs for message type ORDERSWE02 or BD87Count and group by error text
2Identify the root cause from the status recordWE02One cause per group
3Correct master data or configurationFunctional teamFix confirmed in the target client
4Reprocess a single IDoc as a testBD87Status changes to success
5Reprocess the remaining IDocs in batchesBD87No more than 500 per run
6Confirm documents were created or sentBusiness transactionDocument numbers match
7Record the outcome in the ticketService deskCount, cause, fix

Do not do

Do not reprocess IDocs before the root cause is fixed. Do not change the IDoc data in WE02 without recording the change in the ticket. Do not delete IDocs to clear a monitor. Do not resend outbound IDocs that the partner may already have received without checking with them first.

Escalation

If reprocessing fails with the same error after the fix, or if more than the usual number of IDocs fail within an hour, escalate to SAP integration on-call.

Approval

Interface owner / Date
Operations lead / Date

BD87 is the usual status monitor for inbound and outbound IDocs. RBDMANI2 reprocesses inbound IDocs with errors and RBDAGAIN resends certain failed outbound IDocs. Test the exact programs in your release and client before relying on this runbook.

Interface support runbook pack

Ask for a review of your runbooks against the failure statuses you see most often.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the runbook template

Create one runbook per interface or per message type. Fill the scope fields, choose the reprocessing method and name the approver and escalation contact. Export the document and store it where the support team works, usually the service desk knowledge base. The procedure table is intentionally short: select, diagnose, fix, test with one IDoc, reprocess the rest, verify the business document and record the result. Adjust the steps to match local tools, such as a middleware replay for IDocs that originate in an external system.

  • One runbook per interface
  • Name a real approver for bulk runs
  • Review at least once a year

Choosing the reprocessing method

BD87 lets you select IDocs by status, message type and date and then process them in the foreground or background. It works for most inbound failures. Program RBDMANI2 can force reprocessing of inbound IDocs in selected statuses, which is useful for scheduled jobs. For outbound IDocs that never reached the port, RBDAGAIN can resend those in statuses such as 02, 04 and 05. WE19 is the test tool and is better suited to a single IDoc whose data you want to edit and copy than to mass recovery. For IDocs originating outside SAP, the better fix is often to replay from the middleware.

Risks to control

The main risk is duplicate or partial processing. Posting the same order twice, resending a shipment notice a customer already acted on, or reprocessing in the wrong client all cause real damage. That is why the template forces a test of one IDoc, a batch limit and a business check. For outbound resends, confirm with the partner that the first message was not received. For inbound, confirm the application document does not already exist. Write the duplicate check for your interface into the Check column.

  • Test one IDoc before the batch
  • Check for duplicate documents
  • Keep an audit trail in the ticket

Frequently Asked Questions

What is the difference between BD87 and RBDMANI2?

BD87 is an interactive status monitor where you select and process IDocs. RBDMANI2 is a report that reprocesses inbound IDocs with errors and can be scheduled as a job. Both end up calling the same posting logic.

Can I reprocess an IDoc that is in status 53?

No. Status 53 means the application document was posted successfully. Reprocessing would risk a duplicate, so the standard tools do not offer it for that status.

How do I resend an outbound IDoc?

For IDocs that failed to reach the port, use RBDAGAIN or BD87 to dispatch again. For IDocs already delivered where the partner needs a new copy, create a new IDoc from the application document, for example by message control output repeat.

Who should approve bulk reprocessing?

The business owner of the process, such as the order to cash lead for sales orders. They understand the cost of a duplicate. Agree the batch limit in the runbook.

Netray can add a read-only monitor that groups failed IDocs by root cause and proposes the matching runbook step, with a human approving every reprocess.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Integrations

Software