SAPFree templatePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP VC Sales Order UAT Script Template

Configurable materials fail in ways that standard sales orders do not: a value combination nobody tried, a missing price record or a BOM item with the wrong selection condition. A scripted UAT run with recorded inputs makes those defects reproducible.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

SAP Variant Configuration Sales Order UAT Script Template

Test header

Company: Acme Pumps Ltd Test case: VC-UAT-012 Material: PUMP-CONFIG-100 Scenario: Option with surcharge System: QAS / 200 Tester: S. Rao Date: 2026-10-20

Inputs

MOTOR_POWER = 22 kW SEAL_TYPE = Mechanical WETTED_MATERIAL = SS316 PAINT_COLOR = Special RAL

Expected result

Configuration is consistent, BOM explodes with the SS316 housing item, price includes four variant surcharges.

Steps and results

StepActionExpectedActualPass/Fail
1Create sales order and enter configurable materialConfiguration screen opens
2Enter characteristic valuesOnly allowed values offered
3Try an invalid combinationMessage from dependency
4Check configuration statusComplete and consistent
5Open pricing analysisVariant surcharges present
6Check BOM explosion for the itemCorrect items selected
7Save order and record numberOrder number returned

Sign-off

Tester / Date
Business owner / Date
VC consultant / Date

Adapt the steps to your own materials. Record the sales order number and screenshots as evidence. Defects should be logged with the characteristic values used, because the same material can pass with one set and fail with another.

Test case generation

Optional help generating VC test combinations from your class data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the script

Copy the template for each scenario. Fill the characteristic values you will enter and the expected outcome before you start. Run the steps in a quality system, record the actual results and mark pass or fail. Export to PDF as evidence for the project. Plan at least one run per option group and several for invalid combinations.

  • Write expected results before running
  • Record the order number of every run
  • Test invalid combinations on purpose
  • Repeat after each dependency or price change

What to test

A good VC test set covers four areas: allowed values and defaults, dependency messages for rejected combinations, the exploded BOM for the chosen options, and the price with all variant surcharges. Add a change test where the user changes a value after BOM explosion, because it exposes missing re-explosion or stale price.

Reading the results

A pass means all steps match expected values. A fail needs the exact characteristic values, the dependency or condition involved and a screenshot. Group failures: if many tests fail on one characteristic, the cause is likely in the class or dependency, not in the individual orders.

Common mistakes

Testers use only the happy path and miss invalid combinations. Others test in a client where dependencies are not released or where pricing records are missing. A frequent gap is not retesting after transports, so a fix in one object breaks another.

Frequently Asked Questions

How many VC test cases do I need?

It depends on the combinations. Cover every characteristic value at least once, every dependency rule with a passing and failing case, and the main price and BOM paths. Use risk to pick the rest.

Should I test in a production copy?

A quality system with current master data is best. A production copy gives realistic data but check that sensitive customer data is masked according to your policy.

What evidence do auditors want?

Typically the script, the actual results, the order number and screenshots or reports, signed by the tester and business owner. Keep them with the change record or release notes.

Can I automate VC testing?

Yes, with test automation tools or custom scripts that create orders with defined value sets. Start with the manual script to find the cases worth automating.

If you want help generating test combinations from your class and dependency data, we can build a read-only generator for your system.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations