Quality & InspectionFree templatePDF, Excel, Word exportMedical Devices

ISO 13485 Internal Audit Report Template (with Sample Findings and Checklist)

This ISO 13485 internal audit report template includes a filled sample so you can see what a good finding looks like: a clause reference, the evidence found, a type, and a CAPA link. Change the fields, export to Word or PDF, and use the short checklist during the audit.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

ISO 13485 Internal Audit Report Template

Internal Audit Report

Organization: Acme Medical Devices Ltd Audit number: IA-2026-04 Audit date: 2026-10-14 Lead auditor: J. Rivera (Quality Engineer) Process audited: Purchasing and supplier evaluation

1. Scope and criteria

Scope: Purchasing process, approved supplier list maintenance, incoming inspection records for the last six months.

Criteria: ISO 13485:2016 clause 7.4, QP-004 Purchasing procedure, applicable regulatory requirements

Method: interviews, document and record review, sampling of records, observation. The auditor was independent of the process audited.

2. Findings

No.TypeClauseFinding and evidenceCAPA no.Due date
1Nonconformity7.4.1Three of ten sampled critical suppliers had no documented re-evaluation within the interval set in QP-004. Evidence: approved supplier list rows 4, 7 and 9.CAPA-2026-031
2Observation4.2.4Incoming inspection sampling plan references a superseded revision of the inspection specification in the ERP; the released revision was used on the floor.
3Good practice

3. Conclusion

The purchasing process is generally effective. One nonconformity and one observation were raised. Corrective action is required for the supplier re-evaluation gap.

4. Audit checklist (record answers during the audit)

Question (paraphrased requirement)Evidence reviewedY / N / NA
Are suppliers evaluated and selected on their ability to supply to requirements, with criteria defined?
Is the approved supplier list controlled, with re-evaluation done at the defined interval?
Do purchasing records describe the product, including quality and regulatory requirements?
Is incoming product verified according to a plan matched to risk?
Are supplier performance issues recorded and acted on?
Are previous audit nonconformities closed with effective corrective action?

Sign-off

Lead auditor / Date
Auditee process owner / Date
Management representative / Date

Internal audits under clause 8.2.4 must be planned with a documented procedure, cover the whole system on a schedule that considers risk and previous results, use auditors independent from the area, and report results to management. This sample is a starting point and the checklist paraphrases clause 7.4; it does not replace the standard. Change the clause and criteria for each process audited.

Link audit findings to CAPA data

Optional: see how a private AI layer could retrieve audit evidence and open CAPA status from your systems.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this audit report template

Plan the audit before you write anything: scope, criteria, auditee, date and who is independent. During the audit, record evidence in the checklist table, such as record numbers, lot numbers and who you interviewed. After the audit, write each finding as the requirement, the evidence and the gap, then assign a clause reference and a type: nonconformity, observation or good practice. Link nonconformities to a CAPA so the report and the corrective action system match. Send the signed report to the process owner and include a summary in the next management review.

  • One finding per issue, not a paragraph of mixed problems
  • Cite record IDs, not 'some records'
  • Classify nonconformities consistently, major versus minor, using your own definition
  • Verify effectiveness of earlier CAPAs at the next audit of that process

What ISO 13485 requires of internal audits

Clause 8.2.4 requires audits at planned intervals to check that the quality management system conforms to the planned arrangements, the standard and your regulatory requirements, and is effectively implemented and maintained. The audit programme is planned considering the status and importance of the processes and areas, and the results of previous audits. A documented procedure must describe responsibilities, planning, reporting and records. Auditors must not audit their own work. Management responsible for the area must take timely action on findings, and follow-up must verify the actions and report the results.

Writing a good finding: sample wording

A weak finding says 'supplier evaluation is inadequate'. A strong one says: 'Three of ten critical suppliers sampled had no re-evaluation record within the interval defined in QP-004, rows 4, 7 and 9 of the approved supplier list. Requirement: clause 7.4.1.' The strong version is checkable, traceable and gives the CAPA owner a starting point. Add a risk comment where the gap could affect product quality or compliance, because it influences how quickly the action should close.

Auditor training and checklists

Internal auditor training for ISO 13485 should cover the standard, your regulatory environment, audit planning, interviewing, evidence collection and reporting findings. A checklist is a prompt, not a script, and auditors who read every question aloud miss what the evidence shows. Build checklists from your own procedures and risk, and keep them with the report so another auditor can see the sample. If you need a clause by clause list, start with our ISO 13485 internal audit checklist.

Frequently Asked Questions

What must an ISO 13485 internal audit report contain?

Scope and criteria, the date and auditors, findings with evidence and clause references, conclusions, and follow-up actions. The report is a record under clause 4.2.5 and feeds management review. The exact layout is up to you.

How often should internal audits be done?

Clause 8.2.4 requires planned intervals but does not fix them. Most manufacturers audit the whole system annually and high-risk processes more often. Consider process changes, complaints, and the previous audit results.

Can the quality manager audit their own department?

No. Auditors must be objective and impartial and must not audit their own work. In a small company, use an auditor from another department or an external auditor for that process.

What is the difference between an observation and a nonconformity?

A nonconformity is a failure to meet a requirement of the standard, regulation or your own procedure and needs corrective action. An observation is a potential weakness or improvement opportunity. Your audit procedure should define both.

If audit evidence is spread across your ERP, document control and CAPA tool, Netray can build a private AI layer on your own servers to retrieve it for the auditor in seconds.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring