ISO 13485 Audit Plan Template and Management Review Template

This ISO 13485 audit plan template and management review template give you both documents in one fill-in file. Edit the fields, export to Word or PDF, and use the notes below on clause 7.5, good documentation practices and post-market surveillance.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

ISO 13485 Internal Audit Plan and Management Review Template

Internal Audit Plan: Acme Medical Devices Inc

Scope of QMS: Design, manufacture and distribution of Class II single-use surgical instruments at the Wichita site. Process audited: Production and service provision (clause 7.5) Date: 2026-11-10 Lead auditor: S. Wong (independent of the area audited) Criteria: ISO 13485:2016, company QMS procedures, 21 CFR Part 820 (QMSR), customer and regulatory requirements

Objectives

Determine whether the process conforms to planned arrangements, to ISO 13485 and to applicable regulatory requirements, and whether it is implemented and maintained effectively. Consider previous audit results, complaints, CAPA and process performance when deciding the depth of audit.

Audit schedule

TimeActivityClause focusContact
08:30Opening meetingScope and plan
09:00Production control and work instructions7.5.1
10:30Process validation and equipment records7.5.6, 7.6
13:00Identification and traceability sampling7.5.8, 7.5.9
14:30Cleanliness, environment and records6.4, 4.2.5
15:30Auditor review
16:00Closing meetingFindings summary

Process checklist prompts

PromptEvidence to sampleResult
Are work instructions current and available at point of use?Controlled copies
Do batch records show every step completed, signed and dated?3 recent device history records
Are validated processes within their validated parameters?Validation reports and run data
Can a finished lot be traced to materials and equipment?Mock trace
Were corrections to records made per good documentation practice?Record sample

Management Review Minutes

Date: 2026-12-05 Chair: J. Doe, President Period reviewed: 1 Dec 2025 to 30 Nov 2026 Attendees:

Review inputs (clause 5.6.2)

InputSummary and dataTrend
Feedback
Complaint handling
Reporting to regulatory authorities
Audits (internal, external, supplier)
Monitoring of processes
Monitoring of product
Corrective and preventive action
Follow-up from earlier reviews
Changes that could affect the QMS
Recommendations for improvement
New or revised regulatory requirements

Review outputs (clause 5.6.3)

OutputDecisionOwnerDue
Improvements needed to keep QMS suitable, adequate and effective
Improvement of product related to customer and regulatory requirements
Changes needed to the QMS
Resource needs

Approvals

Lead auditor / Date
Quality manager / Date
Top management / Date

Keep the audit plan, report and review minutes as quality records under clause 4.2.5. Auditors must not audit their own work. Adapt prompts to your process and regulatory markets.

Automate your management review inputs

Optional: see how complaint, CAPA and audit data can be pulled from your ERP into review inputs.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Using the audit plan and review templates

Clause 8.2.4 requires internal audits at planned intervals to check conformity and effective implementation. Plan the program by risk and importance of each process, then use one plan per audit like the first half of this template. Management review under clause 5.6 happens at planned intervals and must consider the inputs listed, with outputs recorded as decisions with owners and dates. Both documents are records, so keep signed copies.

  • Audit independence: auditors do not audit their own work
  • Use results of the last audit, complaints and CAPA to set depth
  • Review the QMS at least annually, more often if risk requires

What is ISO 13485 clause 7.5

Clause 7.5 covers production and service provision. It requires controlled conditions: documented procedures and work instructions, suitable equipment, monitoring and measurement, labeling and packaging operations, and the use of validated processes where output cannot be verified. Sub-clauses address cleanliness, installation, servicing, sterile devices, process validation, identification, traceability, customer property and preservation of product. Traceability for implantable devices must include component and work environment records.

Good documentation practices and post-market surveillance

Good documentation practice means records are attributable, legible, contemporaneous, original and accurate: one line strike-through for corrections with date, initials and reason, no white-out, no pre-dated entries, and electronic records protected by access controls and validated software. Post-market surveillance is the proactive collection and review of experience from devices in the field, including complaints, service data and literature, and it feeds management review, risk management and CAPA. Regulators in several markets require a documented plan and periodic reports.

Common mistakes

Treating management review as a slide deck without decisions, auditing only against procedures instead of the standard and regulations, allowing the quality manager to audit their own function, and keeping handwritten corrections that obscure the original entry. Make sure every review output has an owner and due date and that actions are tracked to closure.

Frequently Asked Questions

How often are ISO 13485 internal audits required?

The standard says at planned intervals. Most companies cover the whole QMS at least once a year, with higher risk or poorly performing processes audited more often, based on a documented audit program.

What must be in ISO 13485 management review?

Inputs include feedback, complaints, regulatory reporting, audits, process and product monitoring, CAPA, follow-up actions, changes, recommendations and new regulatory requirements. Outputs cover improvements, changes and resources.

What is post-market surveillance under ISO 13485?

It is the ongoing collection and analysis of data on devices in the market, such as complaints and service records. ISO 13485 links it to feedback, complaint handling and regulatory reporting, and many markets add formal plan and report requirements.

What are good documentation practices?

Records must be attributable, legible, contemporaneous, original and accurate. Correct errors with a single line, initials, date and reason, never obscure the original, and protect electronic records with validated systems and access control.

Netray can build a private AI assistant over your ERP and quality records so audit and review inputs such as complaint trends are produced from live data on-prem.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs