AS9100 Document Control Procedure Example with KPIs and Audit Plan
This pack gives you a working AS9100 document control procedure and the supporting artifacts auditors ask for: a process interaction table, a KPI list and an audit plan with time schedule. Fill in the fields, edit the rows, and export to Word or PDF.
Fill in
AS9100 Document Control Procedure and Template Pack
Document Control Procedure QP-4.2-01 Rev C
Company: Acme Aerospace Components Ltd Process owner: Quality Manager
1. Purpose and scope
This procedure defines how Acme Aerospace Components Ltd creates, approves, issues, changes, distributes, protects and retires documents of the quality management system, including documents of external origin such as customer drawings, specifications and standards. It applies to all sites and processes in the certified scope.
2. Responsibilities
The process owner (Quality Manager) approves this procedure and appoints the document controller. Process owners approve documents in their area. All employees use only the current released revision.
3. Method
a) Identification: each document has a number, title, revision, date and approver. b) Review and approval: documents are reviewed for adequacy and approved before release. c) Distribution: controlled copies are made available in ERP document module and controlled network drive. Printed copies are uncontrolled unless stamped. d) Changes: a change request describes the change; the revision history records what changed and why. Obsolete versions are removed from points of use and, if retained, marked obsolete. e) External documents: customer and regulatory documents are logged, and revision status is checked when a purchase order or contract is accepted. f) Records are kept in legible form, protected from loss, with retention of 10 years after last delivery, or longer if the customer requires.
4. Process interaction table
| Process | Input from | Output to | Owner | Key records |
|---|---|---|---|---|
| Contract review | Customer | Planning | Sales manager | Reviewed order, risk record |
| Planning and scheduling | Contract review | Production | Planner | Work order, routing |
| Purchasing | Planning | Receiving | Buyer | Approved supplier list, PO flowdown |
| Production and special processes | Planning, purchasing | Inspection | Production manager | Traveler, process records |
| Inspection and release | Production | Shipping | Quality manager | FAI, inspection report, CoC |
| Delivery and support | Inspection | Customer | Logistics manager | Packing list, delivery record |
5. KPI list
| KPI | Definition | Target | Frequency | Owner |
|---|---|---|---|---|
| On-time delivery | Lines shipped on or before promise date divided by lines due | 95% | Monthly | Logistics manager |
| Quality escapes | Customer returns per million parts shipped | Below 500 | Monthly | Quality manager |
| Supplier on-time and quality | Receipts accepted on time divided by receipts due | 95% | Monthly | Buyer |
| First pass yield | Parts passing inspection first time divided by parts inspected | 98% | Weekly | Production manager |
| Corrective action closure | Corrective actions closed within due date divided by total due | 90% | Quarterly | Quality manager |
6. Audit plan
Audit start: 2026-11-09 Lead auditor: A. Singh Scope: Contract review, production control, special processes, inspection Criteria: AS9100 and company procedures Method: interviews, record sampling, process observation and trace of at least one order from contract review to delivery.
| Time | Process / clause area | Auditee | Auditor |
|---|---|---|---|
| Day 1 09:00 | Opening meeting, scope, context and risk | Top management | A. Singh |
| Day 1 10:30 | Contract review and customer requirements | Sales manager | A. Singh |
| Day 1 13:30 | Planning, configuration management | Planner | A. Singh |
| Day 2 09:00 | Production, special processes, FAI | Production manager | A. Singh |
| Day 2 13:00 | Purchasing and supplier control, counterfeit parts | Buyer | A. Singh |
| Day 2 15:30 | Closing meeting, findings, action dates | Top management | A. Singh |
Sample wording, not a certified procedure. Paraphrase and adapt to your own processes; do not copy clause text from the standard. Allocate audit time by risk and past performance, and confirm requirements with your registrar.
Automate AS9100 KPI reporting
See how KPIs such as on-time delivery can be calculated from your ERP without exporting to spreadsheets.
Optional. The tool and every export work without this. No spam.
What the document control procedure must cover
AS9100 expects documented information to be identified, reviewed, approved, available at points of use, protected and controlled for changes and retention. Aerospace adds specifics: controlling documents of external origin such as customer drawings and specifications, verifying revision status at contract acceptance, and keeping records for the period customers or regulators require. The sample procedure above covers each element in plain language that you can adapt.
- Unique identification, revision and approval on every document
- Current revision at point of use, obsolete copies removed or marked
- Customer and regulatory documents logged with revision check
- Records protected, retrievable and retained for a defined period
Process interactions and KPIs
A process interaction table (often drawn as a turtle diagram or flowchart) shows inputs, outputs, owners and records for each process, which is the quickest way to prove you understand how the system flows. Pair each process with a measurable KPI. Aerospace customers care most about on-time delivery and quality escapes, so start there and add supplier performance, first pass yield and corrective action closure.
Building an audit plan that works
An internal audit plan lists scope, criteria, method, date and time, auditee and auditor for each session. Schedule high-risk processes more often, such as special processes, and keep auditors independent of the area audited. Trace one real order end to end, because it exposes handoff gaps that process-by-process questions miss. Record evidence, not opinions, and agree finding due dates at the closing meeting.
Frequently Asked Questions
Is a documented document control procedure mandatory in AS9100?
AS9100 requires control of documented information, but it does not force a specific procedure format. Most registrars and customers expect a written procedure because it is the simplest way to prove the control exists and is followed.
What KPIs should an AS9100 company track?
At minimum track on-time delivery and product conformity, then add supplier performance, first pass yield, customer complaints and corrective action closure. Customers often provide their own scorecards, so align definitions with them.
How long is a typical AS9100 audit?
Registrars set audit days based on headcount, sites and complexity. A small shop may need two to four days for the initial audit, larger sites more. Internal audits are shorter and spread across the year according to risk.
Can I copy the standard's wording into my procedure?
No. The standard is copyrighted. Describe what your company does in your own words and reference the clause number. Auditors want to see your actual practice, not a repeat of the requirement.
Netray can connect a private on-prem AI layer to your ERP so on-time delivery, supplier and nonconformance KPIs are calculated from live data rather than assembled by hand.
Related Tools
AS9100 Process Turtle Diagram Template
Fill-in turtle diagram for one QMS process, covering inputs, outputs, resources, methods, competence and performance measures.
Quality & InspectionAS9100 Internal Audit Report Template
Generate a structured internal audit report with scope, criteria, findings, observations and follow-up for an AS9100 quality management system.
Aerospace & DefenseAS9100 Audit Readiness Checklist
A 30-point checklist for AS9100 Rev D certification and surveillance audits, weighted toward the aerospace-specific requirements where auditors write the most findings.
Aerospace & DefenseAS9100 Certification Cost Estimator
Calculator for the total cost of AS9100 certification: registrar fees, consultant, training, internal time and the three year surveillance cycle.
Costing & FinanceManufacturing KPI Formula and Definitions Reference
A searchable lookup of the KPI formulas controllers and operations managers argue about, with units, typical ERP source and review cadence.
More Aerospace & Defense tools
See all- AS9102 Form 1 Part Number Accountability Template
- AS9102 Form 3 Characteristic Accountability Worksheet
- FOD Prevention Program Checklist
- Aerospace Key Characteristics Worksheet
- AS9102 Form 2 Product Accountability Template
- Nadcap Special Process Supplier Approval Tracker
- Aerospace Material Review Board Disposition Template
- Aerospace Delta FAI Trigger Worksheet
- Aerospace Supplier OTD and Quality Rating Calculator
Keep exploring
Free tools
- AS9100 Audit Report and Management Review ExampleA completed sample AS9100D internal audit report with findings plus sample management review minutes, editable and exportable as your own template.
- Monthly Operations Review Meeting Pack TemplateA ready-to-fill monthly operations review document covering results, KPI table, variances, risks, actions and approvals.
- IATF 16949 PFMEA, Control Plan and PPAP Example PackA linked pack of PFMEA, control plan and PPAP summary examples for a machined part. Change the part and operation and the documents update.
ERP fixes and how-tos
- SAP QM Sample-Drawing Procedure: Setup and Use (QPV1)Set up an SAP QM sample-drawing procedure with QPV1: containers, number of samples, link to the inspection plan and lot, and how physical samples are created.
- How to Create a Sampling Procedure in SAP QMCreate a sampling procedure and sampling scheme in SAP QM: QDV3, QDP1, sample types, valuation modes and how to assign them to inspection plans.
- How to create an inspection plan in SAP QM (QP01)Create an inspection plan in SAP QM with QP01: header, operations, master inspection characteristics, sampling procedure and material assignment, plus a plan report.
Runs with your ERP
- SyteLine Shipping and Logistics with Pacejet: pick, pack, ship and rate shopHow Single Source Systems' SyteLine Shipping and Logistics and Pacejet handle pick, pack, ship and parcel or LTL rate shopping for SyteLine manufacturers.
- NeuConnectz mobile scanning with SAP S/4HANA and Business OneWhat NeuConnectz does with SAP S/4HANA and Business One: mobile pick, pack and ship with barcode, QR and RFID scanning, how it connects and what to check.
Guides
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.
- SyteLine Patch Management and Hotfix Deployment ProcessManage patches and hotfixes for Infor SyteLine with testing, deployment, and rollback procedures. Structured approach to keeping CloudSuite Industrial current.
- SyteLine Pick Pack Ship Configuration GuideConfigure the pick, pack, and ship workflow in Infor SyteLine including wave planning, packing stations, shipping integration, and BOL document generation.
AI on your ERP
- AI for ProShop ERP in AS9100 Machine ShopsAdd AI on top of ProShop ERP to speed up NCR/CAPA drafting, FAI review, and document control, without moving AS9100 quality records off your network.
- AI for AS9100 Quality Management on Your ERPAI on top of your ERP quality module for AS9100D suppliers: NCR/CAPA drafting, FAI support, counterfeit parts screening, with a full audit trail.
Manufacturing hubs
- FMA and the metal fabrication ecosystem: shops, standards and ERP realitiesThe Fabricators and Manufacturers Association serves metal fabrication, stamping and tube and pipe shops: ecosystem, standards, ERP and private AI.
- Aerospace MRO and energy equipment manufacturing in TulsaTulsa aerospace maintenance, repair and overhaul plus energy equipment manufacturing: FAA Part 145, AS9100, API standards, ERP and private AI for shops.