Lot Acceptance OC Curve Calculator for Medical Device Inspection
An operating characteristic curve shows how well a sampling plan separates good lots from bad ones. This calculator gives the chance of accepting a lot at any defect rate for plans with an acceptance number of zero, one or two, and estimates the average outgoing quality.
Your numbers
Your results
Poisson approximation, accurate when the sample is small relative to the lot and the defect rate is low. Use exact hypergeometric or binomial values for small lots or high defect rates.
Probability of acceptance vs lot defect rate
Sweeps True lot defect rate from 0 to 10, holding your other inputs fixed.
Apply sampling plans in your ERP
Want inspection plans driven by supplier and item risk? We can review your setup.
Optional. The tool and every export work without this. No spam.
How to use it
Enter your sample size, choose the acceptance number and set the assumed true defect rate of the lot. The tool reports the probability of acceptance and rejection and the average outgoing quality. The chart plots the full curve across defect rates from 0 to 10%, which is how you see the consumer's risk at a defect rate you cannot tolerate and the producer's risk at a rate you consider good.
The math
With a defect rate p and sample size n, the number of defects in the sample is approximately Poisson with mean np. For acceptance number zero, the probability of acceptance is e to the minus np. For one it adds np, and for two it adds np squared over two, all multiplied by e to the minus np. AOQ approximates p times Pa times the unsampled fraction of the lot.
- c = 0: Pa = exp(-np)
- c = 1: Pa = exp(-np) x (1 + np)
- c = 2: Pa = exp(-np) x (1 + np + np^2 / 2)
- AOQ = p x Pa x (1 - n / N)
Common mistakes
A plan with c equal to zero feels strict but can still accept bad lots when the sample is small. At a 1% defect rate, a sample of 80 accepts about 45% of the time. Many teams expect sampling to guarantee a defect-free lot, but it only controls risk. Critical characteristics should rely on process validation and 100% inspection or verified automation, not on sampling alone.
Frequently Asked Questions
What is the consumer's risk?
It is the probability of accepting a lot whose quality is at or worse than an unacceptable level. On the OC curve, it is the acceptance probability at that defect rate. Lower it by increasing sample size or lowering the acceptance number.
Why does c = 0 have such a steep curve?
With zero acceptance, any single defect rejects the lot, so acceptance falls quickly as the defect rate rises. The curve still has a tail, so poor lots can pass when the sample is small.
How does this relate to AQL tables?
AQL tables, such as the ANSI/ASQ Z1.4 family, are pre-built plans with defined OC curves. This tool lets you see the curve of any n and c, including custom plans such as those from validation protocols.
When should I use hypergeometric instead?
When the sample is more than about ten percent of the lot, or the lot is small. The Poisson shortcut overstates the chance of finding a defect in those cases, so use an exact calculation.
If your inspection plans and lot disposition live in the ERP, we can help review how to calculate risk and apply the right plan by item and supplier.
Related Tools
Medical Device Success Run Validation Sample Size Calculator
Calculates the zero-failure sample size needed to claim a reliability at a confidence level, and splits it across your PQ lots.
Quality & InspectionMedical Device Complaint Rate Trending Calculator
Calculates complaints per 1,000 units, compares against a baseline, and flags a statistical signal using a Poisson upper control limit.
Costing & FinanceMedical Device Cost of Poor Quality Calculator
Totals prevention, appraisal, internal failure and external failure costs and shows COPQ as a share of revenue.
Quality & InspectionASTM F1980 Accelerated Aging Time Calculator
Converts a target shelf life into oven test days using the Q10 accelerated aging factor, and shows the effect of temperature.
More Quality & Inspection tools
See all- CAPA Corrective and Preventive Action Form Template
- Device History Record (DHR) Template
- ISO 13485 Internal Audit Checklist
- Process Validation IQ OQ PQ Template
- Medical Device Complaint Handling Form Template
- ISO 14971 Risk Management Worksheet
- Sterilization Load Record Template
- Medical Device Design Verification Protocol Template
- Medical Device Supplier Evaluation Scoring Worksheet
Keep exploring
Free tools
- SAP QM OC Curve and Acceptance Probability CalculatorSee how a sampling plan behaves: acceptance probability and average outgoing quality across incoming defect rates.
- Supplier Lot Acceptance Probability CalculatorCalculates the chance an incoming lot is accepted for a given supplier defect rate and sampling plan, and plots the operating characteristic curve.
- Medical Device Lot Reconciliation and Genealogy WorksheetRow-by-row lot reconciliation with yield and unaccounted-unit columns, plus component lot and sterilization lot links for genealogy. Exports to Excel.
Guides
- Medical Device ERP: What ERP for Medical Device Manufacturers Must DoMedical device ERP explained: what ERP for medical device manufacturers must do for DHR, lot and UDI traceability, Part 11, QMSR and ISO 13485, and how to choose.
- Using AI to Review Device History Records Before Lot ReleaseHow a medical device contract manufacturer can use private AI to pre-check device history records for missing entries, cert mismatches and out-of-spec data.
- Lot Traceability for a Medical Device Contract ManufacturerSet up lot traceability in your ERP for medical device work: material certs, forward and backward genealogy, recall drills, and what auditors ask to see.
AI on your ERP
- AI on Infor SyteLine for Medical Device Manufacturers: Genealogy, DHR and Audit EvidencePrivate AI on Infor SyteLine for medical device makers: lot and serial genealogy, DHR assembly, UDI and QMSR evidence, with human approval on every write.
- AI on SAP Business One for Medical Device Manufacturers: Traceability and Records Retrieval Without Touching the Validated StatePrivate AI on SAP Business One for medical device manufacturers: UDI, lot and serial traceability, supplier records, DHR retrieval. Read-only, on-prem, QMSR-aware.