SAP S/4HANA Project Charter Template

A charter is the one document every SAP S/4HANA program needs before anyone builds a plan. This template gives you the sections steering committees expect, with sensible example text you can overwrite.

Fill in

Live preview
Download:

SAP S/4HANA Project Charter Template

Program Charter

Company: Acme Precision Ltd Program: Project Meridian: ECC 6.0 to S/4HANA Executive sponsor: Chief Financial Officer Program manager: A. Sharma Planned start: 2026-11-02 Target go-live: 2027-10-04

1. Business objectives

Exit ECC 6.0 before the end of mainstream maintenance. Standardize finance on Universal Journal. Retire three custom reporting systems. Keep plant operations uninterrupted during conversion.

2. Approach and hosting

Conversion approach: Brownfield (system conversion) Hosting model: RISE with SAP (private edition)

The approach is confirmed after the readiness check, the simplification item review and the custom code analysis are complete. Any change of approach goes to the steering committee as a formal change request.

3. Scope

In scope: FI/CO, MM, SD, PP, QM, PM for 4 plants and 6 company codes. Interfaces to the MES, the tax engine and the bank.

Out of scope: BW to Datasphere redesign, new warehouse management rollout, acquisition entities not yet on ECC.

4. Governance

BodyChairCadenceDecides
Steering committeeChief Financial OfficerMonthlyBudget, scope, go-live date, approach changes
Program boardA. SharmaWeeklyPlan, risks, resourcing, cutover readiness
Design authorityLead architectWeeklySolution design, custom code policy, data model
Change control boardA. SharmaFortnightlyChange requests and transports to production

5. Milestones

MilestoneTarget dateExit criterion
Charter approved2026-11-02Sponsor signature
Design completeFit-to-standard sign-off
Integration test exitNo open severity 1 or 2 defects
Go / no-goSteering committee decision
Go-live2027-10-04Cutover runbook complete

6. Success measures

Month-end close days versus baseline. Open severity 1 and 2 incidents at 30 days after go-live. Share of custom objects retired or remediated. Budget variance at go-live. Business user adoption of the new Fiori apps.

Approvals

Executive sponsor / Date
Program manager / Date
CIO / Date
Finance lead / Date
Operations lead / Date

Starting point, not a contractual document. Replace the example governance bodies and measures with your own. If a system integrator is engaged, align this charter with the statement of work rather than duplicating commercial terms.

Charter review

Send us your draft charter and we will point out missing scope items and unclear decision rights. Optional, no obligation.

Optional. The tool and every export work without this. No spam.

How to use the template

Fill the fields on the left, review the preview, then export to PDF or Word. Start with objectives and scope, because these drive every later decision. Leave milestone dates blank until the readiness assessment is done, then complete the table in the exported document. Circulate the draft to finance, operations and IT leads before the sponsor signs.

  • Write objectives as business outcomes, not technical tasks
  • Name out-of-scope items explicitly
  • Record the approach as provisional until fit-to-standard ends
  • Keep the charter to two pages of decisions

What a good S/4HANA charter contains

The charter fixes the conversion approach, the hosting model, the governance bodies and the measures of success. Greenfield, brownfield and selective data transition lead to very different plans, so state which one you assume and why. For hosting, RISE with SAP private edition bundles infrastructure and basis operations under one contract, while hyperscaler or on-premise hosting leaves them with you. Both decisions affect staffing and budget.

Governance that works

Most troubled programs fail on decision latency, not technology. Define who can approve a scope change, who owns the custom code policy and who calls go or no-go. A design authority prevents each workstream from cloning standard behavior into custom code. A change control board protects the transport path into production.

Common mistakes

Charters often copy the vendor pitch and skip measurable outcomes. Others leave interfaces, reporting and data archiving unmentioned, then discover them in testing. Treat the charter as a living baseline: version it, and re-issue it when the steering committee changes scope or the go-live date.

Frequently Asked Questions

Who signs an SAP S/4HANA project charter?

Normally the executive sponsor, the program manager, the CIO and the business leads for finance and operations. The signatures show that the funded scope, approach and governance are agreed before detailed planning begins.

Should the charter fix the go-live date?

Include a target date, but mark it as provisional until design and the readiness assessment are finished. A hard date set before scope is understood is a common source of later conflict.

How long should the charter be?

Two to four pages is typical. Detailed plans, RAID logs and test strategy belong in separate documents that the charter references.

Is this the same as the statement of work?

No. The charter is an internal governance document. The statement of work is a commercial agreement with a partner. They should be consistent, but they serve different readers.

If you want help scoping an S/4HANA program around your plants and interfaces, Netray can review your draft charter and highlight gaps.