Epicor Labor Detail (LaborDtl) Hours by Employee SQL Query Generator
Plant HR and payroll teams often need a quick view of how many hours each employee booked in a week. This generator writes the SQL for Epicor's LaborDtl table, with an overtime flag and a drill-down by job operation.
Fill in
P is production labor, I is indirect labor in standard Epicor.
Hours per employee with overtime flag
SELECT
ld.EmployeeNum,
SUM(ld.LaborHrs) AS TotalLaborHrs,
SUM(ld.BurdenHrs) AS TotalBurdenHrs,
COUNT(*) AS DetailLines,
CASE WHEN SUM(ld.LaborHrs) > 40
THEN SUM(ld.LaborHrs) - 40
ELSE 0 END AS OvertimeHrs
FROM Erp.LaborDtl ld
WHERE ld.Company = 'EPIC06'
AND ld.PayrollDate >= '2026-10-05'
AND ld.PayrollDate <= '2026-10-11'
AND ld.LaborType = 'P'
GROUP BY ld.EmployeeNum
ORDER BY TotalLaborHrs DESC;Drill down: hours per employee per job operation
SELECT ld.EmployeeNum, ld.JobNum, ld.AssemblySeq, ld.OprSeq, ld.PayrollDate, SUM(ld.LaborHrs) AS LaborHrs FROM Erp.LaborDtl ld WHERE ld.Company = 'EPIC06' AND ld.PayrollDate >= '2026-10-05' AND ld.PayrollDate <= '2026-10-11' AND ld.LaborType = 'P' GROUP BY ld.EmployeeNum, ld.JobNum, ld.AssemblySeq, ld.OprSeq, ld.PayrollDate ORDER BY ld.EmployeeNum, ld.PayrollDate;
Column names reflect the common Erp.LaborDtl layout in Epicor 10 and Kinetic, but confirm them in your database or Data Dictionary Viewer before use. Run read-only against a reporting copy where possible. The threshold applies to the whole date range, so use a single payroll week for a true weekly overtime check, and apply your own local overtime rules.
Labor hours questions answered from Epicor
Optional: see how plain-language questions over Epicor labor data can replace one-off SQL requests.
Optional. The tool and every export work without this. No spam.
How to use the query
Enter your company ID, the payroll date range and the overtime threshold, then copy the first query into a BAQ with a custom SQL expression, SQL Server Management Studio or your reporting tool. Use one payroll week at a time so the threshold means weekly overtime. The second block shows which jobs and operations drive the hours, which helps supervisors explain overtime on a particular order.
What LaborDtl contains
Erp.LaborDtl stores one row per labor transaction, linked to its header in LaborHed. Useful columns include EmployeeNum, JobNum, AssemblySeq, OprSeq, LaborType, LaborHrs, BurdenHrs and PayrollDate. LaborHrs is the time reported by the employee, while BurdenHrs is the time used for burden absorption, and the two can differ when a multi-resource or multi-employee operation applies. For payroll hours, use the payroll date, not the clock-in date, since shifts crossing midnight can split.
- LaborHrs is employee hours reported
- BurdenHrs drives burden absorption
- PayrollDate groups shifts that cross midnight
- Approval status should be checked before payroll export
Reading the result
Employees at the top of the list with overtime above zero need review before payroll closes. Compare the total against clock hours if you use a separate time clock, and check for open labor entries that have not been ended, which understate hours. A large difference between production and indirect hours is also worth a look, since it shows time not charged to jobs.
Common mistakes
Do not run a multi-week range and read the overtime column as weekly overtime. Avoid joining to the employee table without the company filter, which multiplies rows in multi-company databases. Remember that unapproved labor may still appear in the table, and that corrections may be posted as new rows with later dates.
Frequently Asked Questions
Which table has Epicor labor hours?
Labor transactions are stored in Erp.LaborDtl, with a header record in Erp.LaborHed. Hours are in LaborHrs, and burden hours in BurdenHrs. Payroll reporting usually relies on PayrollDate on the detail line, and approval flags in the table decide what can be moved to payroll.
Can I use this inside a BAQ?
Yes, the SQL can be adapted in a BAQ with a subquery or a calculated field, or run directly in SQL Server. In a BAQ you would normally use the Query Builder tables and filters instead of raw text, but the column names and grouping stay the same.
Why do my hours not match the time clock?
Common reasons are open labor entries without an end time, unapproved entries, rounding rules in clock-in processing, and shifts crossing midnight that were grouped by clock-in date. Compare on PayrollDate and check the labor header status for the employee.
Is the overtime flag a legal overtime calculation?
No. It is a simple hours-above-threshold check. Real overtime depends on local law, collective agreements, daily limits, holidays and which hours count as worked. Use it to find employees to review, then apply your payroll rules.
If you want to ask questions like which employees exceeded 45 hours last week without writing SQL, ERPray can answer them read-only over your Epicor data, showing the query it ran.
Related Tools
Excel Timesheet and Overtime Formula Generator
Creates ready-to-paste Excel formulas for night-shift hours, unpaid breaks, rounding, daily and weekly overtime, and gross pay.
Safety & WorkforceOvertime Rules by Country Reference
A quick comparison of statutory overtime thresholds, premium rates and caps in major manufacturing countries, with caveats to verify locally.
EpicorEpicor Shop Floor Labor Reporting SOP Template
A fill-in standard operating procedure for how operators clock on, report quantities, record scrap and close operations in Epicor.
Safety & WorkforcePlant HR and Labor KPI Definitions Reference
A lookup table of the workforce KPIs plants report, with the formula, unit and a note on how to read each one.
More Epicor tools
See all- Epicor Kinetic Job Status Reference
- Epicor BAQ Query Template Generator
- Epicor BPM Directive Design Template
- Epicor DMT Import Template Worksheet (Part and BOM)
- Epicor MRP Run Checklist
- Epicor Kinetic Upgrade Checklist
- Epicor REST API v2 URL Builder
- Epicor Security Group Design Worksheet
- Epicor Kinetic Customization Change Request Form Template
New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Epicor BAQ Query Template GeneratorFill in company, days back and status filters to get a starter SQL for an open jobs BAQ, plus a design checklist for the Query Builder.
- Epicor Kinetic Data Load Effort CalculatorEstimate total data migration hours for an Epicor project from record counts, error rate and number of test cycles.
- Epicor Job Material Shortage SQL GeneratorBuild a query that lists unissued job material for released, open jobs so planners can chase shortages.
ERP fixes and how-tos
- Epicor: No Employee Attached to User, Supplier Not Approved, Serial Mask TokensFix the Epicor error no employee attached to user, plus supplier not approved for operation and serial mask token setup, and where to look in Kinetic.
- Why Is Epicor So Slow? A Kinetic Performance ChecklistDiagnose slow Epicor Kinetic: separate client, app server, SQL Server, BAQ and network causes, with a step-by-step checklist and ways to tell slow from down.
- How to Complete an Operation in Epicor Kinetic (Plus Time Entry and Corrective Action)Complete an operation in Epicor Kinetic through MES or Labor Entry, plus time and expense entry, customer managed inventory and corrective action, with what to check first.
Guides
- Epicor vs Infor: Should You Switch ERP Platforms?Compare Epicor Kinetic vs Infor CloudSuite for manufacturing. Functional analysis, migration costs, and decision framework for switching platforms.
- SyteLine Labor Tracking and Reporting ConfigurationConfigure SyteLine labor tracking. Employee time reporting, labor rate setup, attendance integration, and efficiency analysis for manufacturing operations.
- How to Configure Labor Tracking in Infor SyteLineStep-by-step guide to configuring labor tracking in Infor SyteLine, including employee setup, time entry methods, labor rate configuration, and efficiency reporting.
AI on your ERP
- Private AI for Epicor Kinetic Cloud, Outside the Multi-Tenant BoundaryRun a private LLM on Epicor Kinetic private cloud or Kinetic Cloud data via BAQs, REST v2 and Data Fabric, keeping sensitive manufacturing data off shared AI.
- Epicor Kinetic AI for Aerospace and Defense Suppliers: Traceability, Quality and CUI, On-PremOn-prem AI for aerospace and defense suppliers on Epicor Kinetic: traceability, AS9100 quality, CUI and ITAR handling, and why cloud AI features need care.
Integrations
- How to add a mobile app to Epicor KineticBuild or choose a mobile app for Epicor Kinetic: barcode scanning, labor reporting, inventory moves and approvals over the REST API, with offline handling.
- How to add an AI chatbot to Epicor KineticAdd an AI chatbot to Epicor Kinetic: an internal assistant for planners and buyers or a customer portal bot, grounded in BAQs and runnable fully on-prem.
Software
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.