OracleFree templatePDF, Excel, Word exportOracle E-Business SuiteDiscrete ManufacturingAll Oracle E-Business Suite tools

Oracle EBS Engineering Change Order (ECO) Request Template

Engineering change orders in Oracle Engineering work best when the business case and affected objects are agreed before the ECO is keyed. This request template captures them so the change control board can decide quickly.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Oracle EBS Engineering Change Order Request Template

Engineering Change Request

Company: Acme Precision Ltd Change number: ECO-2026-0147 Title: Replace seal kit on valve assembly Type: Quality fix Priority: High Requested by: Design engineering

Description

Replace seal kit SK-210 with SK-215 to remove field leak issue found in complaint investigation. Update the BOM and the assembly work instruction.

Reason and evidence: Three field returns in the last quarter traced to seal wear. Supplier test report attached.

Revision and effectivity

Primary item: AS-10045 Revision: B to C Effective date: 2026-11-15 Existing stock: Use up

Affected objects

ObjectIdentifierActionOwner
Bill of materialAS-10045Add and disable components
Routing
Work instruction or drawing
Supplier or purchasing
Open jobs

Approvals

Engineering / Date
Quality / Date
Manufacturing / Date
Purchasing / Date
Change control board / Date

A starting point for your change control procedure, not an official Oracle form. Adjust fields to your quality system and the ECO workflow configured in your EBS instance.

Change impact from live data

Optional expert review of how to show where-used and open job impact directly from your EBS data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Complete the header, describe the change and the evidence, then state the revision and effectivity. List every object that must change: bills of material, routings, drawings, work instructions and supplier arrangements. Export as PDF for the change board. Once approved, create the ECO in Oracle with the same change number and attach this document for traceability.

  • State what changes and why in plain language
  • Decide disposition of existing stock before approval
  • Name an owner for every affected object

How effectivity works

In Oracle, an ECO schedules changes to a bill of material or item revision on an effective date. Components can be added, disabled or changed in quantity, and open jobs may or may not pick up the change depending on how you manage them. Agree whether the change applies by date, by lot or serial number range, or from a specific job, and record that decision here so production and purchasing know the cut-in point.

Choosing the disposition

Use up is cheapest when the old part is acceptable until depleted. Rework or scrap is necessary when the old design is unsafe or non-conforming. Return to supplier applies to purchased parts that are still returnable. Whichever you pick, ask planning to adjust purchase orders and safety stock so you do not buy the old component after the cut-in date.

Common mistakes

Changes fail when affected routings and work instructions are forgotten, when open jobs keep issuing the old component, or when suppliers learn about the change late. For regulated products such as aerospace or medical, record approvals and evidence carefully because they are part of configuration control. Do not reuse a change number for a different change, and close the ECO promptly after implementation.

Frequently Asked Questions

Is ECO the same as ECN?

In practice the terms overlap. Some companies use ECR for a request, ECO for the authorised order, and ECN for the notice sent out. Oracle Engineering uses engineering change orders. Align the wording with your own procedure.

Does this create the ECO in Oracle?

No. It is a request and approval document. After approval an engineer keys the ECO in Oracle Engineering or loads it using your normal method.

What should be attached?

Drawings, test reports, complaint data, supplier quotations and any risk assessment. Attach whatever the change board needs to decide without calling you.

How do open jobs get handled?

Decide per job whether to complete on the old revision, rework, or reissue. Record the decision in the affected objects table so production and planning act consistently.

If you want ECO status, affected items and open job impact visible from your ERP data, Netray can design a private reporting layer.

Get Oracle E-Business Suite alerts

Support and maintenance deadlines, release changes that affect Oracle E-Business Suite sites, and new free Oracle E-Business Suite tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Oracle E-Business Suite: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Comparisons

Software